Contentteller

Contentteller Support Forums
Home Forums > Contentteller > Version 1.x >

More granular control of news, posts etc

Discussion in 'Version 1.x' started by rasp1, Aug 10, 2008.

  1. rasp1 Guest

    More granular control of news, posts etc

    I mentioned this in the support ticket, but I will suggest it here...

    We are going to end up with 5-7 different, but interated sites. These sites will for the most part be independent, but we will need to have the ability to post a story specifically on site 1 and 3 or site 2, 3, and 4. Or if it is posted to all the sites to be able to bump off, or not display it on one specific site.

    Also is there a way to bump items off the front page and into the specific archive quicker than it usually does?

    What is the Edit fields entry for exactly?
    rasp1, Aug 10, 2008
    #1
  2. Philipp Guest

    More granular control of news, posts etc

    We are going to end up with 5-7 different, but interated sites. These sites will for the most part be independent, but we will need to have the ability to post a story specifically on site 1 and 3 or site 2, 3, and 4. Or if it is posted to all the sites to be able to bump off, or not display it on one specific site.
    This is something that will be never easily possible with Storyteller. However, it should be quite easy to modify Contentteller to doing this though.

    Also is there a way to bump items off the front page and into the specific archive quicker than it usually does?
    Yes, there is an option in the news story form to show items on the front page. Just set this to “no” and the news story in question will no longer show up on your front page

    What is the Edit fields entry for exactly?
    You can add additional fields with this option to the news story form. Then you can add the fields to your pages with the templates. See also http://www.esselbach.com/review4.html
    Philipp, Aug 10, 2008
    #2
  3. rasp1 Guest

    More granular control of news, posts etc

    I guess the main question is when will content teller be ready for a production environment? What is left todo in the RC0 release?
    rasp1
    rasp1, Aug 11, 2008
    #3
  4. Philipp Guest

    More granular control of news, posts etc

    Actually, RC1 is the current release ;)

    The main focus of the Release Candidates is to fix all remaining bugs. There are no more database or template changes planned, so you can already start using the current release.

    Also, customers have instant access to all bug fixes after I will post them on a private bugfixes forum on http://community.contentteller.com. Just register there and then add your registered username in the forums form in the members’ area.
    Philipp, Aug 11, 2008
    #4
Tweet
Facebook:
Forgot your password?
Contentteller Support Forums
Home Forums > Contentteller > Version 1.x >
  • Home
  • Forums

    Forums

    Quick Links
    • Search Forums
    • What's New?
  • Members

    Members

    Quick Links
    • Registered Members
    • Current Visitors
    • Recent Activity
  • Help

    Help

    Quick Links
    • Smilies
    • BB Codes
    • Trophies

Separate names with a comma.

Advanced search...
    Forum software by XenForo™ ©2011 XenForo Ltd.